Friday, March 30, 2007
II. Conclusion
Time really flies. In the twinkling of an eye, I’m already half way through my attachment. Rain or shine, I have to go out to collect the samples. There was one occasion where it was raining the whole day and we had to walk to the plant using umbrellas. This was one experience which I will never forget. Without the help of the poly interns (who had left), the job can be quite physically demanding especially when I have to climb 8 stories to collect one boiler water sample because the elevator broke down. It also can be stressful at times when the water samples results are off specs and my supervisor was not around to guide me.
ps: 12 weeks to go! =)
-
I guess this is a beautiful mistake too...# ;